Operations guide · Order progress

How to Track Glass and Aluminium Workshop Orders

“Where is this order now?” is hard to answer when surveys, approvals, materials, and installations live in different places. Useful tracking shows the last completed step, the current blocker, the person responsible, and when the next update is due.

GUIDE 025 practical stepsStart reading

Key takeaways

  • Track the work stage separately from the blocker.
  • Give every update an owner and a follow-up time.
  • Update customers at meaningful milestones rather than guessing.

Step by step

Use stages that mean the same thing to everyone

Start with request recorded, survey scheduled, survey completed, quote sent, quote approved, job preparation, installation, and verification. A stage shows where the order is; a separate note explains what is wrong.

Check: Would the owner and installer interpret this status the same way?

Keep one source of context per order

Connect contact details, site, work items, measurements, the approved quote, and schedule to the relevant order. Attach photos and site notes to the correct item or stage so they do not get mixed between customers.

Check: Can a teammate understand the job without reading every chat?

Name the blocker and the person responsible

“In progress” does not reveal whether the team is waiting for customer approval, materials, revised dimensions, or an installer schedule. Add who needs to do what and when it will be checked again.

Check: What is blocking progress, who will act, and when will it be updated?

Update at meaningful handoffs

Update the record when the survey is completed, a quote is revised or approved, materials are ready, installation is scheduled, an issue appears, or work is verified. Avoid marking work finished before evidence or corrections are reviewed.

Check: Does the latest update describe an actual event and next step?

Give customers an actionable update

Tell them the current stage, any decision you need from them, and when to expect another update. If the schedule changes, explain why and what happens next without promising a date before checking crew and material readiness.

Check: Does the customer know what happened and when to expect news?

An update that actually helps

Vague: “Mr Budi’s order is still in progress.” Useful: “Survey complete; revised kitchen window measurement recorded. Quote version 2 sent today. Waiting for customer approval; admin will follow up tomorrow.” The owner and admin can now act on the same information.

Minimum fields for a progress board

  • Order reference and customer name.
  • Current stage and last update date.
  • Blocker or decision awaiting a response.
  • Owner and next follow-up date.
  • Links to relevant measurements, quote, photos, or work evidence.

A simple board is enough to start with a small team. As order volume grows, AlumiFlow helps connect office tasks and field activity so everyone can follow progress together.